Skip to main content
CIC
Error processing SSI file


Participating Organisations - Contractor (1)


Alchmex International Construction Limited

  • Central Kowloon Route - Kai Tai East
  • O. Park 2

Back to Participating Organisations


Associated Engineers Limited

  • CLP - CPPS Lighting & Small Power Equipment Service
  • HKHA - RHS Term Contract (2019/2022) 
  • Lift Maintenance of  Pristine Villa
  • ARCS  O&M Choi Ming Court
  • ARCS  O&M Lai Yan Court
  • Lift Maintenance of  Fu Ning Garden
  • ARCS O&M Yau Lai Estate
  • Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at various Sewage Treatment Work and Pumping Stations in Sha Tin and Sai Kung (2020 – 2023)

Back to Participating Organisations


Bestrich Engineering Limited

  • Construction of Sitting-out area at Hang Ming Street (Area 90 in Ma On Shan)

Back to Participating Organisations


Bouygues Travaux Publics

  • Trunk Road T2 and Infrastructure Works for Developments in the Former South Apron
  • Tuen Mun-Chek Lap Kok Link - Northern Connection Sub-sea Tunnel Section
  • Causeway Bay Typhoon Shelater to Admiratly Tunnels
  •  Inter-Reservoirs Transfer Scheme - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir 
  •  Central Kowloon Route - Central Tunnel  

Back to Participating Organisations


Build King Group

  • Kai Tak Development - Stage 3B Infrastructure at Former North Apron Area
  • Construction of Columbarium at Cape Collison Road in Chai Wan
  • Construction of a 30-classroom Primary School at Shui Chuen O, Sha Tin
  • Site Formation and Infrastructure Works for Police Facilities in Kong Nga Po
  • Cross Bay Link, Tseung Kwan O - Road D9 and Associated Works
  • Intermodal Transfer Terminal Building at Airport
  • North Commercial District Footbridge 1 at Airport
  • East Hall Expansion Works at Airport
  • Station Enhancement Works at Lo Wu
  • Admiralty SCL Related Works Project
  • Main Contract For the Construction of 300 Place Student Hostel At New Asia College Of The Chinese University Of Hong Kong
  • Proposed Residential Development Project at Ma Sik Road
  • Proposed Residential Development at Tuen Mun Town Lot No. 520. Kwun Chui Road
  • Tung Chung New Town Extension – Reclamation and Advance Works
  • St. Paul's Hospital Redevelopment – Final Phase
  • Crescent Green
  • Main Contract Works for Proposed Commercial Redevelopment at No. 1-5 Irving Street & No. 14 Pennington Street, Causeway Bay
  • Main Contract of Proposed  Composite Development at N.K.I.L. 6534
  • Foundation and ELS Works for Proposed Commercial Development
  • Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung
  • Kwu Tung North New Development Area, Phase 1: Site Formation and Infrastructure Works
  • Tseung Kwan O - Lam Tin Tunnel - Road P2 and Associated Works

Back to Participating Organisations


Chevalier International Holdings Limited

Chevalier (Aluminium Engineering) Limited

Chevalier (Building Supplies & Engineering) Limited 

Chevalier (Construction) Company Limited

Chevalier (E & M Contracting) Limited 

Chevalier (Envirotech) Limited

Chevalier (HK) Limited

Lam Woo & Company Limited

  • Upgrading of Kwun Tong Preliminary Treatment Works
  • Provision of On-site Chlorine Generation Plants at Sheung Shui, Silver Mine Bay, Siu Ho Wan and Ma On Shan Water Treatment Works
  • URA Project DL-6: YTM Proposed Composite Development at Tai Kok Tsui
  • Proposed Residential Redevelopment at 292 Prince Edward Road West, HK
  • Proposed Church Facilities Residential Care Home and Senior Hostel Development
  • Expansion of Blood Transfusion Service Headquarters
  • Extension of Operating Theatre Block for Tuen Mun Hospital
  • Upgrading of Kwun Tong Preliminary Treatment Works
  • Lift Replacement at Trafalgar Court
  • Lift Modernization at Kowloon Plaza
  • Superstructure Main Contract for YLTL 532, j/o Wang Yip Street West and Hong Yip Street, Tung Tau Industrial Area, Yuen Long
  • Proposed Office Development at AIL462, Yip Kan Street and Wong Chuk Hang Road, Hong Kong
  • Conversion of Secondary Pool of Children's Pool for the Provision of Heated Pool at Morse Park Swimming Pool Complex

Back to Participating Organisations


China Geo-Engineering Corporation

  • Queen’s Hill Development - Sewage Pumping Station Works
  • Preventive Maintenance Programme of roadside Man-made Slopes/Retaining Walls in Urban Region (Package B)
  • Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung
  • Enhancement Works for Kwun Tong Sewage Pumping Station
  • Landslip Prevention and Mitigation Programme 2018, Package K, Landslip Prevention and Mitigation Works in Hong Kong Island, Kowloon, the New Territories and Outlying Islands
  • Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
  • Slope Improvement Works along EAL Phase 5B
  • Landslip Prevention and Mitigation Programme, 2017 Package D, LPMit Works

Back to Participating Organisations


China Harbour Engineering Company Limited

  • Handling of Surplus Public Fill
  • Midfield Apron Development Works at Airport
  • Construction of Departmental Quarters for Customs and Excise Department at Tseung Kwan O Area 123 (Po Lam Road)
  • Hong Kong–Zhuhai–Macao Bridge Hong Kong Boundary Crossing Facilities - Phase 2 and Other Works
  • North Runway Crossway Taxiway at Airport

Back to Participating Organisations


China International Water & Electric Corporation

  • Water Supply to New Housing Developments in Sheung Shui and Fanling - Mainlaying in Sheung Shui and Fanling Areas
  • CEDD Maintenance Contract for Seawalls and Navigation Channels (2016-2021)

Back to Participating Organisations


China Overseas Building Construction Limited

  • Proposed Residential Development at New Kowloon Inland Lot No. 6549, Off Hing Wah Street West,Cheung Sha Wan, Kowloon
  • A 30-classroom Secondary School at Site KT2e, Development at Anderson Road, Kwun Tong

Back to Participating Organisations


China Railway 15 Bureau Group Company Limited

  • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shung Him Tong to Kau Lung Hang)

Back to Participating Organisations


China Railway First Group Company Limited

  • Widening of Tai Po Road (Shatin Section)

Back to Participating Organisations


China Railway Group Limited

  • Widening of Tai Po Road (Shatin Section)
  • CWB Tunnel (NP section) and IEC Link

Back to Participating Organisations


China Road and Bridge Corporation

  • Tseung Kwan O - Lam Tin Tunnel - Road P2 and Associated Works
  • Cross Bay Link, Tseung Kwan O - Main Bridge and Associated Works
  • Drainage Maintenance and Construction in Mainland North Districts
  • Highways Department Term Contract (Management and Maintenance of High Speed Roads in New Territories West and Kowloon, and Roads in Hong Kong Port Area 2016-2022)
  • Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2018 - 2024)
  • Eastern Vehicular Tunnel Advance Works
  • Third Runway Concourse Foundation and Substructure Works
  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works  - Contract 6
  • Kai Tak Development – Stage 3 Infrastructure Works for Developments at the Southern part of the Former Runway

Back to Participating Organisations


China State Construction Engineering (Hong Kong) Limited

  • Development at Anderson Road – Site Formation and Associated Infrastructure Works
  • Tseung Kwan O - Lam Tin Tunnel - Main Tunnel and Associated Works
  • Relocation of Sha Tin Sewage Treatment Works to Caverns – Site Preparation and Access Tunnel Construction
  • Hiram's Highway Improvement Stage 1 - between Clear Water Bay Road and Marina Cove
  • CWB Tunnel (Slip Road 8 Section)
  • Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities
  • Construction Support Infrastructure Works at Airport
  • APM & BHS Tunnels on the Existing Airport Island
  • NCD Enabling Works & APM Depot Fit-Out at Airport
  • NCD Main Infrastructure Works at Airport
  • Exhibition Centre Station & Western Approach Tunnel
  • Foundation, ELS and Pile Cap Works for Proposed Mixed Housing Development at Pak Wo Road, Fanling
  • Construction of Public Housing Development at Tuen Mun Area 54 Sites 3 & 4 (East)
  • Construction of Public Housing Development at Tsing Hung Road, Tsing Yi
  • Foundation for Public Housing Development at Chiu Shun Road, Tsueng Kwan O
  • Foundation, Site Formation, Road and Drainage for Public Rental Housing Development at Tai Po Area 9, Tai Po
  • Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
  • Foundation for Public Housing Development at Kai Tak Sites 2B5, 2B6
  • Foundation and Site Formation for Subsidised Sale Flats Development and Public Rental Housing Development at Ma On Shan Road (SSF) and Hang Tai Road, Ma On Shan Area 86B Phase 1 (PRH)
  • NSL Cross Harbour Tunnels
  • O. Park 2
  • Design, Build and Operate First Stage of Tseung Kwan O Desalination Plant
  • Sky Bridge connecting Terminal 1 with North Satellite Concourse

Back to Participating Organisations


Chiu Hing Construction & Transportation Company Limited

  • Highways Department Term Contract - Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads ( 2017-2023)

Back to Participating Organisations


Chun Wo Group

Vasteam Construction Limited

  • Shek Wu Hui effluent polishing plant - Main Works Stage 1 - Civil Works for Sludge Treatment Facilities and 132kV Primary Substation
  • Uprating of Chai Wan Salt Water Supply System - Mainlaying and Upgrading of Siu Sai Wan Salt Water Pumping Station
  • Main Contract for Subsidized Sale Flats Project at Shatin Area 36C
  • Revamp of Public Toilets at Terminal Buildings at Airport
  • Construction of Reprovisioning Facilities at Hong Ning Road Park and Ngau Tau Kok Fresh Water Service Reservoir
  • Construction of Phase 1 Redevelopment of Ming Wah Dai Ha Shau Kei Wan, Hong Kong
  • Alternations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible (Designated Contract Area: Tai Po, North District and Outlying Islands (North))
  • Queen’s Hill Development - Road and Drainage Works
  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
  • In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) - Advance Works
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 7 and 8
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phase 11
  • CWB Tunnel (NP section) and IEC Link
  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 3
  • Construction of Government Flying Service Kai Tak Division
  • Rehabilitation of Trunk Sewers in Tuen Mun
  • Hong Kong Disneyland Resort Project – Arendelle Completion Package
  • Alterations, Addition, Maintenance and Repair of Buildings and Lands and Other Properties for which the ASD (Property Services Branch) is Responsible for Central, Peak and Mid-levels
  • Foundation for Public Housing Development at Tuen Mun Area 29 West
  • Foundation for Public Housing Development at Anderson Road Quarry Site RS-1
  • Revamp of Public Toilets at Terminal Buildings at Airport
  • Foundation for Public Housing Development at Tung Chung Area 99
  • Foundation, ELS and Excavation Works for Proposed Residential Development at Yan Tong Inland Lot No. 44, Junction of Shung Shun Street and Yan Yue Wai
  • Foundation for Public Housing Development at North West Kowloon Reclamation (NWKR) Site 1 (East)
  • Construction of Public Housing Development at Hiu Ming Street
  • CMME at Race Course
  • Development of Anderson Road Quarry Site - Road Improvement Works and Pedestrian Connectivity Facilities Works Phase 2A 

Back to Participating Organisations


China Metallurgical Group Corporation

  • Uprating of Chai Wan Salt Water Supply System - Mainlaying and Upgrading of Siu Sai Wan Salt Water Pumping Station
  • Tseung Kwan O - Lam Tin Tunnel - Tseung Kwan O Interchange and Associated Works
  • Development of Anderson Road Quarry Site - Road Improvement Works and Pedestrian Connectivity Facilities Works Phase 2A
  • Development of Anderson Road Quarry Site - Road Improvement Works 

Back to Participating Organisations


Chun Yip Waterworks Construction (HK) Limited

  • Uprating of Tung Chung FW Supply System - Construction of Tung Chung No. 2 FW S/R
  • Construction of Pressure Management and District Metering Installations for the Fresh Water Distribution Systems of the Kowloon East and Sha Tin Major Supply Zones

Back to Participating Organisations


Chung Hing Waterworks Engineering Company Limited

  • Uprating of Tung Chung FW Supply System - Construction of Tung Chung No. 2 FW S/R

Back to Participating Organisations


CLP Power Hong Kong Limited

CLPe Solutions Limited

  • Main Contract for the student residence development at clear water bay, kowloon for the HKUST
  • CLP Civil and Structure Refurbishment in Castle Peak Power Station, Black Point Power Station and Penny Bay Power Station
  • Distribution Cable Trenching and Laying Works
  • Transmission Cable Installation Works
  • Black Point Power Station Linil - D2 Early Civil Works
  • CLP Shing Kai Road Substation Civil Works
  • D1 Power Station of CLP
  • CLP - CPPS Lighting & Small Power Equipment Service
  • Management, Operation, Installation and Maintenance Contract of the Public Lighting System in Kowloon and New Territories East

Back to Participating Organisations


Continental Engineering Corporation

  • Kai Tak Development - Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway
  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works - Contract 6

Back to Participating Organisations


CR Construction Company Limited

  • Development at 286 Tung Chau Street
  • Composite Development at 286 Tung Chau Street, Sum Shui Po
  • Proposed Redevelopment at 25-31 Sugar Street, Causeway Bay
  • Main Contract forJockey Club One Health Tower for CityU
  • Proposed Residential Development at Yau Tong Inland Lot No:44 at the Junction of Shung Shun Street and Yan Yue Wai
  • Construction of Subsidised Sale Flats Development at On Muk Street Phase 1, Shek Mun, Sha Tin
  • Foundation and Main Works Contract   for DHL Central Asia Hub Second Expansion  at No.6 South Perimeter Road

Back to Participating Organisations


Chit Cheung Construction Company Limited

  • Kai Tak Development - Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway

Back to Participating Organisations


Dragages Hong Kong Limited

  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 2
  • Tuen Mun-Chek Lap Kok Link - Northern Connection Sub-sea Tunnel Section
  • Reprovisioning of Harbour Road Sports Centre and Wan Chai Swimming Pool
  • Office Tower Development at Airport
  • Causeway Bay Typhoon Shelater to Admiratly Tunnels

Back to Participating Organisations


Agrivert Limited

  • O. Park 2

Back to Participating Organisations


Able Engineering Company Limited

  • Design and Construction of Redevelopment of Queen Mary Hospital (Phase 1) - Main Works
  • Construction of Public Housing Development at Tuen Mun Area 54 Sites 1 & 1A

Back to Participating Organisations


ATAL Engineering Limited

  • Provision of Vehicle Examination Equipment and Related Electronics and Control System (VEES) at Tsing Yi Vehicle Examination Centre
  • Vehicle Examination Equip & Control System at Tsing Yi VEC
  • MTR Maintenance Services for Building Services at Shatin to Central Link and Tuen Ma Line SCL-TML
  • HKIA Building and E & M Works for Automation Arrival Bags Delivery at Airport
  • Supply to New Housing Developments in Sheung Shui and Fanling – Upgrading of Tai Po Fresh Water Pumping Station and Associated Works
  • Direct Contract for Fit out works for New Data Halls and Corridor on 14/F and 16/F for MEGA TWO

Back to Participating Organisations


Aster Building Services Limited

  • Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at various Sewage Treatment Work and Pumping Stations in Sha Tin and Sai Kung (2020 – 2023)

Back to Participating Organisations

Last Updated: 2020-10-08 12:50:13