Title (Year) |
|
User Guide for CIC Smart Waste Management Tool (April 2024) | Link |
Guidelines on Site Safety Measures on Working in Hot Weather (Version 4 - April 2022) | Link |
Guidelines on Safety Enhancement of and Notification Arrangement for Truss-out Bamboo Scaffolds (September 2021) | Link |
Guidelines on the Statutory Requirements for Modular Integrated Construction Projects (September 2019) | Link |
Guidelines on Safety of Lift Shaft Works: Volume 3 – Throughout the Occupation Stage of Building (Version 2 - August 2019) | Link |
Guidelines on the Design, Installation and Maintenance of Cast-in Anchors at External Walls of New Buildings (Version 2 - November 2017) | Link |
Guidelines on Planking Arrangement for Providing Working Platforms on Bamboo Scaffolds (Version 2 - September 2017) | Link |
Administrative Guidelines on the Applicability of the Registration Requirements to Professional and Technical Personnel (December 2016) | Link |
Guidelines on Safety of Lift Shaft Works: Volume 4 – Builders’ Lift within Lift Shaft (December 2016) | Link |
Guidelines on Work-Above-Ground Safety (November 2016) | Link |
Guidelines on Arrangement of “Instruction and Supervision” and Code of Practice for Reasonable Measures of “Instruction and Supervision” (October 2016) - Notice of the Code of Practice for Reasonable Measures of “Instruction and Supervision” | Link Notice Link |
Guidelines on the Implementation of “P” and “N” Caring Programme (March 2015) | Link |
Guidance Notes on How to Manage the Maintenance Works carried out by Registered Lift / Escalator Contractor (August 2014) | Link |
Guidelines on Planking Arrangement for Providing Working Platforms on Bamboo Scaffolds (May 2014) | Link |
Guidelines on Safety of Lift Shaft Works: Volume 3 – Throughout the Occupation Stage of Building (November 2013) - Index Summary for Guidelines on Safety of Lift Shaft Works: Volume 1 - Volume 3 |
Link Index Summary Link |
Guidelines on Fabrication of Reinforcement Cages of Bored Piles (July 2013) | Link |
Guidelines on Measures for Protection of Workers’ Wages (Version 2 - March 2013) - Specimen Employment Contract (Extracted from the Guidelines on Measures for Protection of Workers’ Wages, Version 2) |
Link Contract Link |
Guidelines on the Adoption of the Pay For Safety Scheme (December 2012) | Link |
Guidelines on Safety of Lift Shaft Works: Volume 2- During Lift Installation Stage until Issue of Occupation Permit and Handing Over to Developer (January 2012) | Link |
Guidelines on Contract Price Fluctuation System (December 2011) | Link |
Guidelines on Handling Construction Work Injury and Fatal Accident Cases (July 2011) | Link |
Guidelines on Trip Ticket System for Disposal of Construction & Demolition Materials in Private Sector Works (May 2011) | Link |
Guidelines on Dispute Resolution (September 2010) | Link |
Guidelines on Partnering (August 2010) | Link |
Guidelines on Safety of Lift Shaft Works: Volume 1 - During Construction Stage and Before Handing Over to Lift Installation Contractor (July 2010) | Link |
Guidelines on Safety of Tower Cranes (Version 2 - July 2010) | Link |
Guidelines on Administration Charges for Reporting of Site Accidents (August 2008) | Link |
Guidelines on Safety of Site Vehicles and Mobile Plant (June 2008) | Link |
Last Updated: 2024-07-29 15:26:56